Mainline Railways was a British model railway brand that operated between 1976 and 1983, introduced by Palitoy, the...
No products
LMS 9ft Underframe Wagon Wheels included
GWR 12t Box Van built between 1933-1945
A plastic kit requiring assembly and painting of a GWR 4-wheel Coach Brake Composite
A plastic kit requiring assembly and painting of a GWR 4-wheel Coach Composite
Pump House/Boiler HouseMoulded plastic parts that require gluing together. Painting and finishing will be also required.
A plastic kit requiring assembly and painting of an LMS (ex Midland Railway) 48 ft. Suburban Coach all 1st.
A plastic kit to build two N gauge straight platform sections. Requires assembly and painting. Total platform length = 240 mm.
GWR Station Fencing Black - 680mm Panel : 170MM X 12MM
GWR Lineside wire Fencing, (36 posts with wire)
Lineside Fencing, wooden 4 Bar Ranch Style
Lineside Fencing, wooden 4 Bar Ranch Style
Lineside Fencing, LMS Style, white. 860mm Section : 215MM X 20MM
Station Fencing, LMS Style, black. 860mm Section : 215MM X 20MM
Southern Concrete Modular Fencing Panels Length: 485mm
SR Precast Concrete Pale Fencing 600 mm
SR Precast Concrete Pale Fencing (gates & ramps)
Telegraph Poles (16 per pack)
Swan Necked lamps (9 per pack) Includes 9 lamps with a selection of parts to make single, double or wall lamps. Requires painting - 46mm tall - some assembly required
Concrete Lamps (4 Double Standards per pack) Single standards and wall lamps can also be made. Requires gluing and painting - height 64mm
Modern Station / Street Lamps 5 complete lamps. Requires painting and gluing - height 95mm
A plastic kit to build two N gauge platform ramp sections. Requires assembly and painting. For use with Ratio 209 straight platform kit (sold separately).
Signal Box Window Mouldings (pair)
A plastic kit of a Midland Region suburban brake 3rd compartment coach. Requires assembly and painting.
Loco Lifting HoistMoulded plastic parts that require gluing together. Painting and finishing will be also required.OO gauge 1/76 scale.
Provender (Goods) StoreMoulded plastic parts that require gluing together. Painting and finishing will be also required.
10ft GWR Wagon Underframe, RCH fitted
Water TowerMoulded plastic parts that require gluing together. Painting and finishing will be also required.
Carriage ShedMoulded plastic parts that require gluing together. Painting and finishing will be also required.
Coal or Builders Merchant DepotMoulded plastic parts that require gluing together. Painting and finishing will be also required.
Plastic kit of an LMS (ex LNWR) 50 ft. arc roof corridor coach brake 3rd. Requires assembly and painting.
Plastic kit of an LMS (ex LNWR) arc roof corridor brake composite coach. Requires assembly and painting.
A plastic kit requiring assembly and painting of an LMS (ex LNWR) 50 ft. arc roof corridor coach.
Plastic kit of an LMS (ex LNWR) arc roof corridor all 3rd coach. Requires assembly and painting.
A plastic kit requiring assembly and painting of an LMS (ex Midland Railway) Clerestory Coach Brake 3rd.
A plastic kit of a Midland Region express Clerestory composite coach. Requires assembly and painting.
A plastic kit of a Midland Region Clerestory, all 3rd & luggage coach in OO gauge. Requires assembly and painting.
This non-corridor, non-gangwayed coach was built between 1903 and 1910 by the Midland Railway.
GWR Bogie Bolster ‘A’ (with girder load)
Water Trough 30" (760mm)OO gauge 1/76 scale.
Junction or Bracket, Home or Distant
Signal Laddering (etched brass)
Plastic kit to build a platform canopy, by Ratio in N gauge. Requires assembly and painting.
Telegraph Poles (10 per pack)
Water Crane & Fire Devil
Assembly kit to build 4 x Plastic Station/Street lamps in N Gauge